Paul & Karine Morris + Mayris
  • WE WRITE
    • The recipe
  • WE LOVE
    • Life about Morris >
      • Preparation process
    • Life about Mayris >
      • Preparation process
  • WE TRAVEL
    • OUR TRIPS
    • FOOD TIPS >
      • TAIWAN
    • OTHER TIPS
  • WE LIVE
  • WE HITCHED
    • The prologue
    • The proposal
    • The preparation
    • The 1000 cranes
    • The gorgeous bridesmaids
    • The instagram
    • The suave groomsmen
  • WE

House visiting.

5/8/2016

0 Comments

 
Picture
Our view from living room
Have been hearing fellow neighbors who have managed to barge into their apartment and we decided to try out on Sunday 6pm to see if its possible to get to our flat. The security on a Sunday is less strict as many of the Foreign workers are back to their dorm to rest for the day. To our surprise, we managed to sneak into our block and i told papaTan to climb up to our unit which is located at the #17 floor. (He thought i was joking when i told him to climb the stairs up)
Picture
The whole place looks very raw. No doors and tiles yet.
Picture
Captured while standing at the corner of where my TV will be.
Picture
Gonna hack away this kitchen wall for open concept.
Picture
Tiles are lying on the living room flat.
Picture
Our kitchen
Picture
Service yard view
To be honest, i did not really like my kitchen layout as the bomb shelter takes up space in my kitchen (near to the service yard) which means i am unable to create kitchen cabinet and worktop space on both sides. After much thoughts, we decided to hack away the wall and build an island. This is the only possibility that i could fully utilize the kitchen. If i knew of such constraints during the start of flat selection, i would have choose other units based on our awesome queue #80 but oh well, 4 years ago we are still quite noob in this area.
Picture
Common toilet
Picture
Master bedroom toilet
The next limitation we faced is that i am unable to build full length mirror in the toilet as there is only 1 ventilation point in the master bedroom toilet and its located right on-top of the toilet so we are only able to build a simple mirror with storage cabinet only.

Anyway, we are still discussing whether to remove the sink provided by HDB as i understand some of the basin's quality is inferior and not lasting. But there again, all these are actually paid for with our hard earned money. I guess we need some further discussion on this to finalize what to do with the bathroom. 
Picture
The bedroom
Picture
Master bedroom
Hoping keys will come really soon!
0 Comments

    Mr & Mrs Tan.

    Awaiting our haven in Punggol.

    Archives

    November 2017
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    February 2016
    July 2015
    March 2015
    October 2014
    September 2014
    July 2014
    April 2014
    March 2014
    February 2014
    September 2013
    May 2013
    March 2013
    August 2012

    Categories

    All
    Bed
    Bosch
    Carpentry
    Colors Design
    Electrician
    Fridge
    Hitachi
    Home Renovation
    Home Sweet Home
    Kitchen
    KitchenAid
    Kitchen Appliances
    Lighting
    Lighting Points
    Microwave Oven
    Oven
    Pkmhomedesign
    Platform Bed
    Power Points
    Promotion
    Punggol
    Renovation
    Renovation Nightmare
    Simmons
    TOP
    Wardrobe
    Waterway Sundew
    Wood Laminate

    RSS Feed

Powered by Create your own unique website with customizable templates.